This guide focuses on agreeing on an acceptable outcome before production begins. The worked example follows three units: “design request”, “reference material” and “review version”.
Reference input: request and reference material. Expected output: a request queue with entry criteria. Before assigning work, confirm the current input version and who will review the result.
Write requirements that can be observed
An acceptance criterion for the internal design request intake describes a checkable property of the outcome. “Make it professional” expresses an expectation but does not resolve a review. For design request, specify required content, reference version, destination and evidence of compliance. When a criterion involves editorial judgment, define who applies it and show a commented example. Agreeing before production exposes different interpretations while they are still inexpensive to resolve. Do not introduce new criteria at the end without recognizing their effect on the work already committed. A usable criterion supports a decision rather than simply expressing a preference.
Show a passing example and a failing example
Compare two versions of reference material. One retains the required information, uses current material and supports the next stage. The other may look finished but leaves an important condition unchecked. In this process, watch the failure of accepting a request without a confirmed format, destination or date. Document the specific difference instead of applying a broad quality label. A useful comparison explains which observation would change the decision. If no evidence can resolve the disagreement, the criterion still needs refinement or an authorized person to interpret the case. The comparison should reveal an actionable difference, not just a subjective ranking.
Worked example
The fictional request asks for an asset for one destination but attaches a reference in another format. The team confirms size, use and review criteria before production. A reference guides the assignment without replacing a description of the required outcome.
The example involves Sofia, Valeria and Camila. Names, situations and numbers are illustrative and do not represent customer results. The three units let you test the proposed approach before extending it to other work.
| Unit | Observable requirement | Failure condition | Acceptance |
|---|---|---|---|
| design request | Current input and defined outcome | Missing version or destination | Valeria checks the requirement |
| reference material | Consistent with approved material | An unresolved difference remains | Sofia obtains a resolution |
| review version | Receiver can use the outcome | Final check has not run | Camila retains evidence |
Define who accepts and what evidence remains
The person accepting review version needs the criteria, access to the reviewed version and time to decide. Record acceptance, return or conditional acceptance with reasons. Conditional acceptance needs an explicit outstanding item and clear boundary; it must not be mistaken for full closure. Retain evidence another reviewer would need to understand the decision. Comment volume does not determine acceptance. A traceable decision about the correct version and agreed requirements does. This distinction helps teams avoid reopening finished work merely because someone discovers an old discussion after the delivery has moved on.
Resolve ambiguity before closure
To validate a request queue with entry criteria, the proposed check is to compare the request with minimum intake requirements. If applying a criterion to a real case exposes ambiguity, record it and resolve it with the approver. Distinguish clarifying an unclear instruction from changing the requested outcome. The first explains how to check the existing agreement; the second may require capacity and a new decision. Check whether the defect affects other units as well. At closure, leave an identified version and enough explanation that the next review does not need to renegotiate from the beginning what compliance means.
What to check before closure
The risk to control in this case is accepting a request without a confirmed format, destination or date. A completed label needs a supporting observation. Keep the following beside the decision so the receiver can establish what was checked:
- Input and version used: request and reference material.
- Case check: compare the request with minimum intake requirements.
- Outcome under review: a request queue with entry criteria.



